top of page

C31 LLT Start-up

When the C31 LLT is turned on it will display some diagnostic LEDs as illustrated below:

Start-up: Self-test

 

When the power button is pressed the LEDs and meter self-test sequence will operate, as illustrated in the following video.

​

The Tester flashes red then green five times (1 second each cycle). Meanwhile the meter rotates smoothly up to 30+ kV, then returns to 0 kV. Then the LEDs are off (for 2 seconds), green (for 2 seconds), then off (for 2 seconds). The green LED then illuminates until the Tester times-out, is turned off or is used to measure a voltage.​

​

bottom of page